?

Log in

No account? Create an account
September 2nd, 2009 - Doug Ayen's Blacksmithing Blog — LiveJournal [entries|archive|friends|userinfo]
Doug Ayen

[ userinfo | livejournal userinfo ]
[ archive | journal archive ]

September 2nd, 2009

working on the workbench [Sep. 2nd, 2009|11:20 am]
Doug Ayen
Since I last posted about getting the rolling mill and press working on the metallurgy workbench, I finished removing the nest material and related gunk, and on the advice of a friend more electronics-clued than I flooded the area with water until all trace of the ammonia odor was gone and the crud all gone.

I then placed a blower on it to speed drying, and the weather has been dry, if cool, so I hope by the weekend it will be safe to plug in.

The loose wires were fairly obvious where they went, so everything is connected back up, I think. I'll see if I can find a fuse box somewhere in the control panel -- considering how much gunk was directly on the terminal block, I have to imagine there were some shorts.

--d
link1 comment|post comment

navigation
[ viewing | September 2nd, 2009 ]
[ go | Previous Day|Next Day ]